国产一区欧美日韩伊人网_国产欧美日韩第一章午夜在线观看_亚洲精品国产专区91在线_国产精品污污污www_婷婷夜夜躁天天躁人人躁_若梅广场舞包你射广场舞_性欧美视频在线观看_欧日韩综合免费视频一区_a免费毛片在线播放_亚洲AV无码国国产产精品久久一

020-34901288




Water paint for plastic

Water paint for plastic

Product description: Safety, health, non-pollution, low carbon and non-toxic Main components: Aqueous alkyd resin/ Water-borne acrylic resin/ Aqueous fluorocarbon/ Waterborne polyurethane resin, Waterborne environmental pigments, Water auxiliaries. Applicable products: Surface protection and decoration for plastic. Accessory products: SX-XB series acrylic plastic lacquer SX-SE series epoxy plastic lacquer(Double component) SX-SBP series polyurethane plastic lacquer(Double component) SX-SFP series fluorocarbon plastic lacquer(Double component) SX-SPT series elastic plastic lacquer SX-SUV series plastic light oil




Water paint for plastic





Product description: Safety, health, non-pollution, low carbon and non-toxic
Main components: Aqueous alkyd resin/ Water-borne acrylic resin/ Aqueous fluorocarbon/ Waterborne polyurethane resin, Waterborne environmental pigments, Water auxiliaries.
Applicable products: Surface protection and decoration for plastic.
Accessory products:
SX-XB series acrylic plastic lacquer
SX-SE series epoxy plastic lacquer(Double component)
SX-SBP series polyurethane plastic lacquer(Double component)
SX-SFP series fluorocarbon plastic lacquer(Double component)
SX-SPT series elastic plastic lacquer
SX-SUV series plastic light oil



(Guidance of construction technology)

Single coating layer:Base materials treatment without greasy dirt --> oloring with Waterborne acrylic plastic lacquer(40-60℃/30-60min) --> another day(or baking for 1-2h)--> surface covering with double component plastic paint(Or UV shaded light)
Construction conditions: The construction temperature is above 5 centigrade, and the air humidity must be less than 80%.
Base material treatment: Bottom wood should be clean without greasy dirt.
Construction viscosity:Use pure water to adjust the viscosity and add 5%-10% according to the weight of water lacquer. The specific amount of addition depends on the construction effect; General adopt spraying, also rolling, dip coating, must be confirmed in advance of the customers technical conditions, in order to provide the appropriate products.
Drying condition: Can be dried at normal temperature and can also be baked at low temperature to save the time. It is suggested that 60-80 ℃ * 20-30mins.

Performance index:


No

Test project

Test method

Technical indicators

1

Film appearance

GB 1729

The film is even, smooth and without pinholes.

2

Adhesion (delimi method)

GB 9286

1grade

3

Pencil hardness

GB 6739

HB


1.Before spraying, it is necessary to check whether the spray gun is clean, and whether the air compressor is normal to remove the oil and water.
2.The painting room should be clean and tidy, no dust, ash and so on.
3.The packing bucket should be sealed and the label is cleared to prevent the use of the wrong material.
4.Painting room ambient temperature should be controlled above 10 degree, the optimal range of 20-30 degrees, humidity should be controlled below 80%, the optimal range of 60-70%.
5.It is suggested that the water-based paint should be filtered by200 mesh silk cloth  after diluted, and then sprayed.
6.During construction, the surface of the coated material should be kept clean, no dust and oil pollution and so on.
7.The use period of the waterborne double component is 3h, and it is recommended to use it within 3 hours after the curing agent is added.


Quality guarantee period:The expiry date of the coating is half a year. Be sure to use it in the period of validity so as not to affect the quality of the coating。
Storage conditions: The product should be sealed and stored in the environment of
0℃-40℃.






Hot products






Water paint for plastic

Water paint for plastic

Product description: Safety, health, non-pollution, low carbon and non-toxic Main components: Aqueous alkyd resin/ Water-borne acrylic resin/ Aqueous fluorocarbon/ Waterborne polyurethane resin, Waterborne environmental pigments, Water auxiliaries. Applicable products: Surface protection and decoration for plastic. Accessory products: SX-XB series acrylic plastic lacquer SX-SE series epoxy plastic lacquer(Double component) SX-SBP series polyurethane plastic lacquer(Double component) SX-SFP series fluorocarbon plastic lacquer(Double component) SX-SPT series elastic plastic lacquer SX-SUV series plastic light oil

Water paint for plastic





Product description: Safety, health, non-pollution, low carbon and non-toxic
Main components: Aqueous alkyd resin/ Water-borne acrylic resin/ Aqueous fluorocarbon/ Waterborne polyurethane resin, Waterborne environmental pigments, Water auxiliaries.
Applicable products: Surface protection and decoration for plastic.
Accessory products:
SX-XB series acrylic plastic lacquer
SX-SE series epoxy plastic lacquer(Double component)
SX-SBP series polyurethane plastic lacquer(Double component)
SX-SFP series fluorocarbon plastic lacquer(Double component)
SX-SPT series elastic plastic lacquer
SX-SUV series plastic light oil



(Guidance of construction technology)

Single coating layer:Base materials treatment without greasy dirt --> oloring with Waterborne acrylic plastic lacquer(40-60℃/30-60min) --> another day(or baking for 1-2h)--> surface covering with double component plastic paint(Or UV shaded light)
Construction conditions: The construction temperature is above 5 centigrade, and the air humidity must be less than 80%.
Base material treatment: Bottom wood should be clean without greasy dirt.
Construction viscosity:Use pure water to adjust the viscosity and add 5%-10% according to the weight of water lacquer. The specific amount of addition depends on the construction effect; General adopt spraying, also rolling, dip coating, must be confirmed in advance of the customers technical conditions, in order to provide the appropriate products.
Drying condition: Can be dried at normal temperature and can also be baked at low temperature to save the time. It is suggested that 60-80 ℃ * 20-30mins.

Performance index:


No

Test project

Test method

Technical indicators

1

Film appearance

GB 1729

The film is even, smooth and without pinholes.

2

Adhesion (delimi method)

GB 9286

1grade

3

Pencil hardness

GB 6739

HB


1.Before spraying, it is necessary to check whether the spray gun is clean, and whether the air compressor is normal to remove the oil and water.
2.The painting room should be clean and tidy, no dust, ash and so on.
3.The packing bucket should be sealed and the label is cleared to prevent the use of the wrong material.
4.Painting room ambient temperature should be controlled above 10 degree, the optimal range of 20-30 degrees, humidity should be controlled below 80%, the optimal range of 60-70%.
5.It is suggested that the water-based paint should be filtered by200 mesh silk cloth  after diluted, and then sprayed.
6.During construction, the surface of the coated material should be kept clean, no dust and oil pollution and so on.
7.The use period of the waterborne double component is 3h, and it is recommended to use it within 3 hours after the curing agent is added.


Quality guarantee period:The expiry date of the coating is half a year. Be sure to use it in the period of validity so as not to affect the quality of the coating。
Storage conditions: The product should be sealed and stored in the environment of
0℃-40℃.