国产一区欧美日韩伊人网_国产欧美日韩第一章午夜在线观看_亚洲精品国产专区91在线_国产精品污污污www_婷婷夜夜躁天天躁人人躁_若梅广场舞包你射广场舞_性欧美视频在线观看_欧日韩综合免费视频一区_a免费毛片在线播放_亚洲AV无码国国产产精品久久一

020-34901288




Hardware tools, lamps waterborne paint

Hardware tools, lamps waterborne paint

Product description: Safety, health, non-pollution, low carbon and non-toxic Main components: Waterborne alkyd resin / water-based acrylic resin / amino resin / waterborne polyurethane resin, waterborne environmental pigments, water auxiliaries Applicable products: Surface protection and decoration for hardware tools and lamps. Accessory products: SX-ALC series alkyd low temperature lacquer(120-130℃) SX-ALB series acrylic low temperature lacquer(120-130℃) SX-AMB series acrylic acid medium temperature lacquer(150-160℃) SX-AMP series polyurethane lacquer SX-BC series acrylic Alkyd lacquer SX-BP series acrylic polyurethane paint(Double component)




Hardware tools, lamps waterborne paint





Product description: Safety, health, non-pollution, low carbon and non-toxic
Main components: Waterborne alkyd resin / water-based acrylic resin / amino resin / waterborne polyurethane resin, waterborne environmental pigments, water auxiliaries
Applicable products:  Surface protection and decoration for hardware tools and lamps.
Accessory products:
SX-ALC series alkyd low temperature lacquer(120-130℃)
SX-ALB series acrylic low temperature lacquer(120-130℃)
SX-AMB series acrylic acid medium temperature lacquer(150-160℃)
SX-AMP series polyurethane lacquer
SX-BC series acrylic Alkyd lacquer
SX-BP series acrylic polyurethane paint(Double component)


(Guidance of construction technology)

Single coating layer:Workpiece cleaning --> bakeout(air-dry)  --> degreasing and dedusting --> workpiece preheating --> painting(air/ static) --> Leveling(on line inspection) --> baking --> inspection
Construction conditions: The construction temperature is above 5 centigrade, and the air humidity must be less than 80%.
Base material treatment: The surface of the coated material should be clean and dry, without obvious water stains, grease, dirt, mould, demoulding agent, weathering substance, lacquer film and other objects. Removal of rust by hand or mechanical grinding. If needs to spray thickness of the higher dry film (> 40μm ) at one time during the assembly line, suggest workpiece should be preheated (35-50℃), to avoid sagging uneven.
Construction viscosity:Use pure water to adjust the viscosity and add 10%-30% according to the weight of water lacquer. The specific amount of addition depends on the construction effect; General adopt spraying, also rolling, dip coating, must be confirmed in advance of the customers technical conditions, in order to provide the appropriate products.
Drying condition: A series of water-based lacquer products must be baked at 160-190℃ by 15-30mins by the drying road, can be packed after cooling. The self-dry paint series can be dried at normal temperature and can also be baked at low temperature to save the time. It is suggested that 60-80 ℃ * 20-30mins.


Performance index:



no

Test project

Test method

Technical indicators

1

Film appearance

GB 1729

The film is even, smooth  and without pinholes

2

Adhesion (delimi method)

GB 9286

≤1 grade

3

Impact resistance

GB/T 1732-93

50kg.cm

4

Flexibility

GB/T 1731-93

2mm

5

Pencil hardness

GB 6739

H

6

Water resistance

GB/T 1733

240h, no bubbles, no shedding

7

Aging resistance

QUV-A

24h, No obvious discoloration



1.Before spraying, it is necessary to check whether the spray gun is clean, and whether the air compressor is normal to remove the oil and water.
2.The painting room should be clean and tidy, no dust, ash and so on.
3.The packing bucket should be sealed and the label is cleared to prevent the use of the wrong material.
4.Painting room ambient temperature should be controlled above 10 degree, the optimal range of 20-30 degrees, humidity should be controlled below 80%, the optimal range of 60-70%.
5.It is suggested that the water-based paint should be filtered by200 mesh silk cloth  after diluted, and then sprayed.
6.During construction, the surface of the coated material should be kept clean, no dust and oil pollution and so on.
7.The use period of the waterborne double component is 3h, and it is recommended to use it within 3 hours after the curing agent is added.


Quality guarantee period:The expiry date of the coating is half a year. Be sure to use it in the period of validity so as not to affect the quality of the coating。
Storage conditions: The product should be sealed and stored in the environment of
0℃-40℃.





Hot products






Hardware tools, lamps waterborne paint

Hardware tools, lamps waterborne paint

Product description: Safety, health, non-pollution, low carbon and non-toxic Main components: Waterborne alkyd resin / water-based acrylic resin / amino resin / waterborne polyurethane resin, waterborne environmental pigments, water auxiliaries Applicable products: Surface protection and decoration for hardware tools and lamps. Accessory products: SX-ALC series alkyd low temperature lacquer(120-130℃) SX-ALB series acrylic low temperature lacquer(120-130℃) SX-AMB series acrylic acid medium temperature lacquer(150-160℃) SX-AMP series polyurethane lacquer SX-BC series acrylic Alkyd lacquer SX-BP series acrylic polyurethane paint(Double component)

Hardware tools, lamps waterborne paint





Product description: Safety, health, non-pollution, low carbon and non-toxic
Main components: Waterborne alkyd resin / water-based acrylic resin / amino resin / waterborne polyurethane resin, waterborne environmental pigments, water auxiliaries
Applicable products:  Surface protection and decoration for hardware tools and lamps.
Accessory products:
SX-ALC series alkyd low temperature lacquer(120-130℃)
SX-ALB series acrylic low temperature lacquer(120-130℃)
SX-AMB series acrylic acid medium temperature lacquer(150-160℃)
SX-AMP series polyurethane lacquer
SX-BC series acrylic Alkyd lacquer
SX-BP series acrylic polyurethane paint(Double component)


(Guidance of construction technology)

Single coating layer:Workpiece cleaning --> bakeout(air-dry)  --> degreasing and dedusting --> workpiece preheating --> painting(air/ static) --> Leveling(on line inspection) --> baking --> inspection
Construction conditions: The construction temperature is above 5 centigrade, and the air humidity must be less than 80%.
Base material treatment: The surface of the coated material should be clean and dry, without obvious water stains, grease, dirt, mould, demoulding agent, weathering substance, lacquer film and other objects. Removal of rust by hand or mechanical grinding. If needs to spray thickness of the higher dry film (> 40μm ) at one time during the assembly line, suggest workpiece should be preheated (35-50℃), to avoid sagging uneven.
Construction viscosity:Use pure water to adjust the viscosity and add 10%-30% according to the weight of water lacquer. The specific amount of addition depends on the construction effect; General adopt spraying, also rolling, dip coating, must be confirmed in advance of the customers technical conditions, in order to provide the appropriate products.
Drying condition: A series of water-based lacquer products must be baked at 160-190℃ by 15-30mins by the drying road, can be packed after cooling. The self-dry paint series can be dried at normal temperature and can also be baked at low temperature to save the time. It is suggested that 60-80 ℃ * 20-30mins.


Performance index:



no

Test project

Test method

Technical indicators

1

Film appearance

GB 1729

The film is even, smooth  and without pinholes

2

Adhesion (delimi method)

GB 9286

≤1 grade

3

Impact resistance

GB/T 1732-93

50kg.cm

4

Flexibility

GB/T 1731-93

2mm

5

Pencil hardness

GB 6739

H

6

Water resistance

GB/T 1733

240h, no bubbles, no shedding

7

Aging resistance

QUV-A

24h, No obvious discoloration



1.Before spraying, it is necessary to check whether the spray gun is clean, and whether the air compressor is normal to remove the oil and water.
2.The painting room should be clean and tidy, no dust, ash and so on.
3.The packing bucket should be sealed and the label is cleared to prevent the use of the wrong material.
4.Painting room ambient temperature should be controlled above 10 degree, the optimal range of 20-30 degrees, humidity should be controlled below 80%, the optimal range of 60-70%.
5.It is suggested that the water-based paint should be filtered by200 mesh silk cloth  after diluted, and then sprayed.
6.During construction, the surface of the coated material should be kept clean, no dust and oil pollution and so on.
7.The use period of the waterborne double component is 3h, and it is recommended to use it within 3 hours after the curing agent is added.


Quality guarantee period:The expiry date of the coating is half a year. Be sure to use it in the period of validity so as not to affect the quality of the coating。
Storage conditions: The product should be sealed and stored in the environment of
0℃-40℃.